[PEPPY ANGEL (桜月りん&GRAN)] PEPPY ANGEL episode0.2
[Peppy Cherry (Sakuratsuki Rin)] BoSsayo Soda☆Melos no Kisetsu no Flavor (The Melody of Oblivion)
[PEPPY ANGEL (桜月りん&GRAN)] PEPPY ANGEL episode0.1
[Peppy Cherry] Sayoko no Seikon (The Melody of Oblivion)
[PEPPY ANGEL (桜月りん&GRAN)] PEPPY ANGEL episode0.3
[PEPPY ANGEL (GRAN, Sakuratsuki Rin)] Episode 3: Variation (Neon Genesis Evangelion) [English] {Fated Circle}
[4][PEPPY ANGEL (桜月りん&GRAN)] PEPPY ANGEL episode0.4
[Peppy Cherry (Sakuratsuki Rin)] Tokyo Eki Revenge 3 ~Atashi no Naka de Hibiku Kiss (The Melody of Oblivion)
PEPPY ANGEL episode0.3 Baum Kuchen 0.0
[Peppy Cherry (Sakuratsuki Rin)] Tokyo Eki Revenge 2 ~Kimi ni Kanaderu Serenade~ (The Melody of Oblivion)